Remove & Assess
Old finishes and selected installed components were removed so the existing surfaces could be prepared.
Boynton Beach / tile + finishes
Large-format tile, a circular mosaic shower floor, painted surfaces and cabinet installation across two bathrooms in the same home.
The scope
The work combined demolition and removal of worn finishes with large-format tile, a mosaic shower floor, painting and cabinet installation.
The same Boynton Beach project included wall repair, painting and engineered wood flooring in the primary bedroom. The combined work took about one month. That is the history of this project, not a promised turnaround for another home.
Condition to completion
The photo set records the original cracked flooring, installation work, and finished rooms.


The work
Old finishes and selected installed components were removed so the existing surfaces could be prepared.
Floor and bathing-area surfaces were prepared and the large tile layout was organized around each room.
Large-format tile and the patterned shower mosaic were installed with careful edges and transitions.
Repaired and painted surfaces, vanities, mirrors, storage, accessories, and hardware completed the scope.
Removal and installation
The photo sequence includes old finishes, floor installation, the tub surround and mosaic work.
Bathroom 1
Dark tile connects the floor and bathing area, with gray painted walls and mounted vanity storage.
Bathroom 2
Large-format walls contrast with the circular shower-floor mosaic and coordinated cabinet finishes.




Planning similar work? Review our tile installation, bathroom renovation scope and painting services. Plumbing, electrical and waterproofing responsibilities must be confirmed separately in the written scope.
Planning bathroom work?
Share the current condition, the result you want, your ZIP code, and a few photos for a free estimate.