Home improvement project planning

Pre-Sale & Move-In Home Refresh

Plan painting, flooring, tile, and selected repairs before listing or moving in. Serving Delray Beach, Boca Raton, Boynton Beach, and Parkland, with scope and timing confirmed for each project.

EstimateFree project review
CommunicationEnglish and Russian
AvailabilityMonday-Saturday, 8 AM-8 PM

Start with useful details

What to Send for the First Review

A few clear details help us understand whether the project is a fit and what should happen next.

For larger, hidden, or condition-dependent work, an on-site review may still be needed before the scope can be finalized.

  • Your ZIP code and best contact information
  • A short description of the requested result
  • Wide room photos and close photos of details
  • Approximate dimensions or quantities
  • Product links, finish photos, or material choices
  • Timing needs and any access restrictions

Delray Beach and nearby communities

Choose the Work That Fits Your Next Step

For homeowners, buyers, and listing agents planning painting, flooring, tile, and selected finishing repairs in projects around $2,000 and up.

Before the Listing Photos

Agree on the visible priorities: wall repairs, fresh paint, worn flooring, and selected finish details. Share the listing date and rooms that need attention.

Before You Move In

Plan paint, floors, and tile work around your closing date, access, material availability, and furniture delivery.

One Written Scope

Choose the rooms and repairs that matter most. Pricing, responsibilities, exclusions, and scheduling are confirmed before work starts.

Cosmetic improvements do not include structural work, mold remediation, electrical or plumbing work unless separately reviewed and lawfully arranged. Home staging, brokerage services, and a promised increase in sale price are not part of this offer.

How it works

Five Steps With Fewer Surprises

Step 01

Initial Review

We review your location, photos, project description, products, approximate size, and requested timing.

Step 02

Site or Detail Check

When needed, existing conditions, measurements, access, substrates, and other practical requirements are confirmed.

Step 03

Written Scope

The estimate identifies included work, known materials or responsibilities, and important project-specific exclusions.

Step 04

Schedule & Work

Timing is confirmed after the scope, access, key products, and readiness of the work area are agreed.

Step 05

Final Walkthrough

Completed scope, included punch-list items, operation where applicable, and cleanup are reviewed together.

A project-specific estimate

What Can Affect Cost and Timing

Photos are useful, but the existing condition and selected finish often determine the real amount of work.

Existing Conditions

Preparation, damage, surface flatness, moisture, backing, access, removal, and hidden conditions may change the required scope.

Materials & Layout

Product size, pattern, availability, compatibility, cuts, edges, hardware, and manufacturer requirements affect labor and sequence.

Coordination & Changes

Permits, other trades, occupied areas, special access, rush timing, and changes after approval can affect the schedule or price.

Before approval

Read the Scope, Not Just the Total

A useful estimate should make the responsibilities and limits of the work understandable.

Included Work

The surfaces, rooms, installation steps, preparation, finishing, and cleanup included in the project.

Products & Materials

What is customer-supplied, contractor-supplied, selected later, or dependent on availability and final measurements.

Known Exclusions

Items outside the confirmed scope, such as unresolved remediation, engineering, hidden damage, or unlisted trade work.

Change Approval

New requests or newly discovered conditions should be reviewed before extra work proceeds.

Working standards

Clear Decisions at the Moments That Matter

The written estimate controls the project. These working practices help keep that scope understandable from setup through completion.

Protect the Agreed Work Area

Access, occupied areas, nearby finishes, and included protection are reviewed for the specific room and documented scope.

Confirm Changes First

Additional requests and newly visible conditions are discussed before work outside the agreed scope proceeds.

Review the Finished Scope

The completed work, included cleanup, and any documented punch-list items are reviewed at the final walkthrough.

Planning questions

Before You Request an Estimate

The first conversation is easier when the room, products, and desired result are visible.

What should I send for a free estimate?

Send your ZIP code, a short description, wide and close photos, approximate dimensions, timing needs, and links or photos for selected materials or products.

Can you provide a price from photos?

Some straightforward projects can be reviewed substantially from clear photos and product details. Work involving hidden conditions, complex layouts, or uncertain preparation may require an on-site review.

What can change an estimate?

Existing conditions, preparation, access, material choice, layout, compatibility, permits, scheduling requirements, and changes to the agreed scope can affect cost and timing.

When is the schedule confirmed?

Scheduling is confirmed after the scope, responsibilities, key materials, access, and other project-specific requirements are agreed.

Ready to discuss the project?

Send the Details You Already Have

You do not need a perfect plan. Start with the room, the problem, the desired result, and any products you are considering.